Apply Your Cable Following These Simple Steps!

process1

Step 1

Identify or Create an Entry Point

Identify an existing opening or drill a minimum 20mm diameter hole into the surface to create an entry point.

process2

Step 2

Tie the Cable to the Tail & Insert

Tie the cable to the tail end of The Ferret ready to be pulled, and insert the head (wheel end) into the opening.

process3

Step 3

Direct & Feed it Through

Direct it using the body in alignment with the intended direction and feed it through until it reaches the required location.

process4

Step 4

Pull Through the Opening & Untie Ready For Use!

Pull the Ferret through the opening to reveal the cable, and untie ready for use. Then Coil it up ready for the next job!

Have Any Questions About The Application Process? Get In Touch With Us!

12 Month Warranty
close slider

Free 12 Month Warranty